Scope of works:
Our principle scope of works consisted of the on-site production of 4,200 tonnes of Stilcor CSP culverts, ranging diameter from 600 to 3,600mm.
Further work included the design and supply of three large span B381 haul road underpasses, supplied to Roy Hill
directly.
To ensure the timely supply of culverts to the numerous installation crews, located throughout the chainage, we
simultaneously ran two on-site mills across 7 locations, over a five-month period. The project was completed on time
and without incident