Projects

Bechtel (EPCM) & BHP Worsley Alumina

The project consisted of five large deep-corrugated plate structures: two stockpile tunnels installed under a 28m high bauxite stockpile

Roy Hill and NRW Construction Pty Ltd

The Roy Hill Rail project consisted of 344km of railway line connecting the Roy Hill mine in the Pilbara, WA, to the port loading facilities at Port Hedland.